From: route@monster.com
Sent: Monday, October 26, 2015 10:55 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: drive tseter
This resume has been forwarded to
you at the request of Monster User xapeix01
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Charles E. Hockley 2338 Luzius Dr. Corpus Christi TX, 78418 Cell Phone (361) 461-0411 ch.hockley@yahoo.com Objective To find a senior
RF Engineering position where I can use my diversified skills and experience
to improve the performance of my employer’s wireless network, design cost
efficient and effective wireless network solutions which improve coverage and
increase capacity, and provide advanced technical assistance, expertise, and
leadership to my peers, my supervisor, and senior leadership. Skills/Qualifications
·
Having
15 years of experience working on RF Engineering teams, and 11 years working
as an RF Engineer, I started out in the industry performing simple CW drive
tests. Since then I have progressed my career into the current role of
Professional RAN Engineer+ for AT&T, where I manage the four legacy
Cricket Communications markets in South Texas. ·
Though
I lack a BSEE or higher degree in Electrical Engineering or other secondary
education degree programs I do have 15 years of experience working in
wireless telecommunications engineering. What I may lack in the form of a
proper education I have more than made up for in the form of applied
knowledge and real world experience. ·
Extensive
advanced experience setting up and using a variety of RF test collection
tools and post processing software to identify, isolate, and correct
performance affecting problems within CDMA 1x, EVDO and LTE networks: Maxima
Mentor, (Schema), LinkMaster LML & LMA, Agilent/JDSU E6474A, Andrew
Invex3G, Touchwave Blue Rose, Actix Analyzer, Xceed Windcatcher, and Map
Info. ·
Advanced
use of Mentum Planet EV 5.5 and the numerous previous iterations of the tool,
for use in designing new cell sites and outdoor repeater solutions, designing
site modifications for optimization, and creating market level coverage maps.
Experience includes making network and site specific updates for more
accurate coverage analysis, and using customer and subscriber data for
designing cost effective changes and site proposals. ·
Advanced
experience analyzing and manipulating OMs/KPIs to isolate and diagnose
deviant performance issues occurring within wireless voice and data networks,
then using this data to determine if site maintenance or performance
optimization is required. ·
Complex
understanding of Lucent, Nortel, & Huawei Vendor Switch to Base
Station/eNode architecture for 1x, EVDO and LTE networks. ·
Detailed
knowledge of Lucent, Nortel, & Huawei call flow processing, feature
enhancements, and terminology on their 1x, EVDO, and LTE networks. ·
Advanced
experience with using the Lucent 5E OMP, Nortel CACP/CPS and Huawei LMT/M2K
interfaces to make site, sector, carrier/ eNode level parameter changes for
1x, EVDO, and LTE networks. ·
Extensive
use of network analyzers and PN scanners to identify and mitigate both in and
out of network interference. ·
Extremely
experienced in designing, implementing, integrating, and optimizing the
performance of new cell sites, capacity carriers, and indoor/outdoor
repeaters in existing networks. ·
Advanced
experience using and modifying Excel Macros to process data and create
scripts used for parameter modifications. ·
Use
of MS PowerPoint to create detailed presentations used to inform team
members, decision makers and peer organizations about projects, plans, and
information pertaining to performance affecting changes made to the Wireless
networks. Education
1989-1992San
Pasqual High School, Escondido Ca. 1992UH-1
Helicopter Repair School, Ft. Rucker Al. 2005-2006Western
International University, Online Instruction Training
2001Intro
to 3G technologies, Course 301, Scott Baxter 2001RF-100
& RF-200, Scott Baxter 2002Lucent
IS-95 and 3G-1X RF Design and Growth Engineering 2004Intro
to 1xEVDO technology, Course 340, Scott Baxter 2005Lucent
1xEVDO RF Design Engineering and Call Processing 2005Ericsson
Planet EV 4.x for CDMA 2000 2008EVDO
Performance Measurement & Optimization, Course 344, Scott Baxter 2010Schema
Mentor Training 2011HU
1x training for HU Networks 2012LinkMaster
LML & LMA training, Bruce Morely 2012Xceed
Windcatcher LTE Training 2012Huawei
MME/4G LTE Training 2013LTE
Training, Courses 501/502, 507/508, 511, 512 & 513, Scott Baxter 2013Intro
to GERAN/UMTS/HSPA technologies, Courses 311 & 312, Scott Baxter 2014AT&T
Bronze Level Training for GSM/UMTS 2014 AT&T
Bronze Level Training for LTE 2015AT&T
WF2020 Transformation Learning Series Experience
2014-PresentProfessional
RAN Engineer+, AT&T Inc., South Texas · Senior RF Engineer and POC
for the four legacy CDMA/EVDO/LTE Cricket markets in South Texas: Brownsville,
Corpus Christi, Laredo, & McAllen. · Perform daily monitoring of
market OM KPIs to identify performance affecting issues and the offending
sites, and then coordinate activities with the local switch and field
operations teams as needed to restore service and baseline KPI performance. · Perform parameter
modifications as needed to improve or maintain performance for all three
technologies, (CDMA, EVDO, & LTE), in the South Texas markets. · Identify underutilized
network elements in the legacy CDMA, EVDO & LTE networks which can be
decommissioned due to reduced utilization as customer migrations continue. · Decommissioned CDMA 1x and
EVDO carrier channels, and reduced LTE Channel bandwidth as needed to
consolidate spectrum and free up underutilized spectrum for re-allocation to
the AT&T Mobility Network. · Performed testing and
performance monitoring for executed carrier channel re-tunes in the legacy
Cricket South, Central, and East Texas markets which were required for
spectrum divestitures and re-allocation to the AT&T mobility network. · Evaluated T1 utilization
and approved proposed T1 reductions as requested by the interconnect team. · Evaluated sites proposed
for early decommission to determine if operating costs of the site would
exceed roaming costs if the site were to be shut down early due to costly
site repairs or AT&T Mobility requisitioning. · Completed assigned GSM,
UMTS, LTE and WF 2020 training required for transition to the AT&T
mobility network. 2008-2014RF
Engineer II, Cricket Communications, South Texas Markets ·
As
the Senior RF Engineer for South Texas I was responsible for preparing,
launching, maintaining, optimizing, and growing the CDMA 1x and EVDO networks
in the four South Texas markets, (Corpus Christi, Laredo, Brownsville, and
McAllen), prior to the 2011 Huawei Rip & Replace project. ·
As
determined by headcount I have acted as the lead engineer for peer RF
Engineers and assigned contractors located here in the South Texas markets. ·
I
identified and planned all capacity enhancements in my assigned markets.
These tasks include carrier additions, CE augmentations, Walsh Code parameter
changes, and forward Link power allocation optimization. ·
I
identified, planned and designed all new site additions and existing site augmentations
in a collaborative effort with the local sales teams to provide a high
quality network which focuses on our core subscribers and eliminates
unnecessary Capex spending. ·
I
supervised and completed detailed drive testing and analysis of drive data
which was used to optimize coverage and cell site parameter settings in the
four STX markets prior to and following the May 2008 launch. ·
Performed
investigations into individual customer complaints and worked with the
Cricket operations teams to identify and resolve problems pertaining to site
and switch performance. Complaints due to coverage issues were resolved when
possible and used to determine future proposed Capex spending projects for
coverage enhancements. ·
I
oversaw the completion of all pre-and post-launch antenna optimization work
during the 2008 STX launch. ·
Successfully
met the post launch objective of maintaining a dropped call rate below 1% for
the first 30 days. ·
During
the South Texas launch I successfully identified a performance problem with
the KMW brand remote electrical tilt antennas which caused them to
under-propagate due to dipoles transmitting out of phase. ·
Successfully
worked with the local sales team District Directors and the South/Central TX
Region RF Manager to obtain funding for 36 much needed new sites that
increased our coverage footprint, improved out coverage density and increased
network capacity in South Texas in the year directly following the launch,
2009. ·
Prior
to the 2011 Huawei Rip & Replace project I successfully added 144
capacity voice carriers and 159 capacity EVDO carriers to our Nortel sites in
the South Texas markets. ·
Assisted
in the Hurricane Dolly and Hurricane Ike recovery efforts in 2008, helping my
peers complete a 100% inspection of the affected markets cell sites, and
assisting the Network Operations teams with a speedy network recovery in the
affected markets: McAllen, Brownsville, Beaumont, and Houston. ·
Successfully
designed and integrated the first Nortel multi-band AWS, multi-carrier
overlay in the Laredo and McAllen Markets, while working closely with the
Cricket operations teams, and Nortel Tech Support. ·
Having
had the fastest growing EVDO markets in the company I have been at the
frontline identifying, isolating, and fixing the many capacity and performance
issues we have had since we launched our Nortel EVDO network. ·
Successfully
integrated the first Nortel EVDO multicarrier overlay for Cricket
Communications when our F1 DOMs first met the requirements for capacity
carrier additions. ·
Developed
the Nortel EVDO multi-carrier overlay integration process for Cricket
Communications and conducted local and national training on the process on
the best practices group conference call. ·
Received
three Leap Star awards for exemplary performance while implementing and
optimizing capacity EVDO carriers, and supporting the Pocket Joint Venture
project. ·
Successfully
identified out of network interference in the LRD market near the Laredo
federal building which had significant negative impact on network performance
and worked with Corporate RF to have the interfering source successfully
mitigated. ·
Worked
with Site Development & Tech Ops to implement eDCG additions on one site
for a six-sector conversion, and on six sites for F3 EVDO multi-band carrier
adds. ·
Starting
in late 2010 the local 1x and EVDO networks were severely capacity strained
due to limited RF spectrum, CEM cards, DOM carriers, T1s, ect. To
improve capacity and performance multiple creative solutions were developed
and implemented including Flexpower parameters, Adaptive RC4 parameters,
Overhead channel power settings, Pocket XCEM card adds, Pocket PRL pushes,
DOM carrier reallocations & EVDO carrier adds to Pocket sites. ·
Supported
the Huawei RF Engineering team with the South Texas Rip & Replace project
for the Austin, Brownsville, Corpus Christi, Eagle Pass, Laredo, McAllen, San
Antonio and Temple TX markets. ·
Following
the South Texas Rip & Replace I assumed responsibility for the new and
improved Corpus Christi and Laredo markets utilizing the new Huawei network
architecture and equipment. ·
Assigned
as the RF Engineering lead for the recent South Texas BSC cuts. I oversaw the
planning and testing for the successful BRO/CRP/LRD market BSC cuts from
their old over-capacity BSCs to their new BSCs. ·
Working
with the HU engineering support team I created a process for adding Sprint
network sectors to the Idle Mode neighbor lists on Cricket sites. When
configured on a sector, this allows our customer’s devices to Idle on Sprint
Roaming partner sites when they move outside the existing coverage on the
fringe of our network or when located inside a large core network coverage
hole. ·
Assigned
as the RF Engineering lead for the South Texas market frequency re-tune
project in the BRO/CRP/LRD/MFE markets. I oversaw the planning and execution
of the successful carrier channel retunes completed for Smartphone handset
flashing and the upcoming LTE network implementation. ·
Assisted
the HU Design and implementation team with the successful integration of LTE
in the South Texas markets. ·
Reviewed
LTE Drive Test data collected following the integration of the LTE network
and requested optimization in areas with lower than expected throughputs
and/or weak RSSI/RSRP. ·
Assumed
responsibility for managing performance, optimization and future capacity
optimization for the new LTE networks located in my markets of
responsibility, Corpus Christi and Laredo. ·
Identified
an issue which was causing intermittent spikes in AF’s on numerous cells
located in all of our South Texas markets, with no known cause. After working
with HU TAC to identify the problem, QCI Flow Control settings were allowing
the available Cell Bandwidth to be exhausted; we implemented their solution
and significantly reduced AF’s in all markets in the region. ·
Helped
to identify and solve a problem causing increased LTE Access Failures on High
traffic cells due to the exhaustion of RRC resources, (Connection Licenses),
and successfully implemented a solution using parameter changes. 2006-2008RF
Engineer II, Sprint (Corpus Christi, TX) ·
As
the Corpus Christi market POC I managed the day-to-day operation of the
market and completed all market, regional, and national initiatives as
tasked. ·
Customer
trouble tickets were investigated and closed after identifying and correcting
the network affecting problem. ·
Detailed
drive testing was performed to troubleshoot and identify network affecting
problems and assist with the design and growth of the voice and EVDO
networks. ·
Provided
the market coverage design and capacity engineers with local market knowledge
and input on all coverage and capacity growth projects. ·
Planned
and managed the completion of all market optimization projects on the voice
and EVDO networks. ·
Executed
site level parameter changes as needed on individual sites and clusters to
improve network performance KPIs on the CDMA 1x and EVDO networks. ·
Integrated
and optimized all new cell sites, outdoor repeaters, sector adds, and
capacity carrier adds for the market. ·
Identified
and mitigated out-of-network interference in the forward and reverse links of
the voice network. ·
Assisted
the project manager and contracted RF engineers with the integration and
optimization of the REV0/A EVDO network. ·
Earned
a promotion from RF Engineer I to RF Engineer II. 2004-2006RF
Engineer I, Sprint (Denver, CO) ·
Assisted
with the successful integration and optimization of over 160 sites that were
purchased from Qwest Wireless in Denver in 2004. These sites increased the
market coverage footprint, increased the signal density and increased cell
site capacity for the CDMA 1x and EVDO networks. ·
Executed
site level parameter changes as needed on individual sites and clusters to
improve network performance KPIs on the CDMA 1x and EVDO networks. ·
Member
of the award winning performance optimization team which was responsible for
planning and performing cluster optimization projects on the 1x and EVDO
networks which improved market performance KPIs. ·
Served
as the CDMA 1x semi-soft handoff optimization engineer for the entire market,
reducing dropped calls and access failures through multi-carrier optimization
projects while maintaining a semi-soft handoff success rate greater than 97%. ·
Developed
and conducted assigned training classes on RF and CDMA technology for the RF
engineering team members. ·
Successfully
identified and mitigated out of network interference in the forward and
reverse links of the voice network created by FBI repeaters located on
buildings located throughout the city, and one after-market bi-directional
amplifier purchased online by a customer and placed in his home office. ·
Earned
a promotion from Associate RF Engineer to RF Engineer I. 2001-2004Optimization
Specialist, Sprint (San Diego, CA) ·
Performed
detailed drive testing that was used to troubleshoot and identify network
affecting problems and plan the growth design of the CDMA network in San
Diego, CA. ·
Member
of the CMI replacement team, responsible for replacing legacy base stations
and fiber distributed antenna systems, (CMI’s), with over 230 new Lucent
Modcell sites. ·
Data
filled parameters as needed and coordinated with the Sprint Operations teams
to integrate new sites on-air when ready. ·
Executed
site level parameter changes as needed to integrate new CMI replacement
sites, and on existing sites to improve network performance KPIs on the CDMA
1x networks as part of my responsibilities on the performance optimization
team. ·
Member
of the award winning performance optimization team which was responsible for
planning and performing cluster optimization projects on the CDMA 1x and EVDO
networks which improved network KPIs for the CDMA 1x voice network. ·
Successfully
identified and mitigated out of network interference in the forward and
reverse links of the CDMA 1x network created by sources emanating from US
military installations located in San Diego County. 2000-2001CW
Drive Tester, Broadbay Networks ·
Assisted
with the design and integration of Sprint’s Phase IV expansion project in the
San Diego market. ·
Located
acceptable CW test candidates within proposed search rings, set-up and
performed CW drive tests for proposed site candidates. ·
Performed
drive tests for site integration. ·
Processed
drive data into thematic maps and spreadsheets for the design Engineers. 2000Installer,
TEKsystems Inc. ·
Installed
Inner-Ducting, CAT5, Fiber-Optic, and copper telephone lines in a
Sheetrock manufacturing plant. ·
Performed
detailed Cell Site audits of assigned GTE Wireless sites throughout the San
Diego Market. This included making detailed drawings of the floor plans, an
equipment inventory, taking detailed photos and uploading the data to a
Project Management database. 1998-2000Technician
II, Callaway Golf Ball Co. ·
Production
finishing line Technician II. ·
Applied
experimental paint coatings during the developmental phase of the production
products. ·
Assisted
with the design, de-bug, and optimization of a customized production system. ·
Set-up,
operated, and performed preventive maintenance, troubleshooting, and
cleanup of all finishing line machinery. ·
Managed
assigned team members to accomplish assigned tasks and duties related to
applying urethane coatings to the golf balls. ·
Ensured
proper flow of product through the manufacturing cell in accordance with the
JIT manufacturing process. 1992-1998UH-1 Crew-chief, U.S. ARMY ·
UH-1H/V
helicopter mechanic and flight crew member. ·
Performed
scheduled, unscheduled, and phased maintenance on UH-1H/V series helicopters. ·
Performed
pre-flight and post-flight aircraft inspections. ·
Served
as a flight crew member performing a variety duties including: CrewChief,
Emergency Medical Technician, and Door Gunner. ·
Kept
my assigned aircraft and its associated maintenance forms, records, and
manuals in a high state of readiness. ·
Managed
assigned mechanics to accomplish maintenance projects and assignments. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Spanish |
Beginner |
|
|
|